Last July 7, 2011, (THURSDAY) 11 am, it’s our free day. Should I say thesis day, not free day. We went to Romeo’s house with our group leader Ronald and I (jeivie) just to have a meeting about the chapter 1 of our thesis, with the help of some of our group mate’s Senir and Melvin. Almost 12 noon we started to construct the chapter 1, which is the introductions and it,’s all about the areas that we proposed. That time we also make our update to our blog, but we decided not to post it because of the unfinished company logo. We almost finished constructing the chapter 1 at 8 pm.
THESIS MODE
BREAK TIME
Last July 1O, 2011, (SUNDAY) 5 pm, we gather a meeting about the thesis. The meeting is all about the finances, and participation or division of task.
Last July 14, 2011, (THURSDAY) 11 am, after the laboratory in wired communication with Engr. Simbulan. We decided to go to San Jose City because one of our friends referred us to San Jose Cable. Because San Jose Cable is A Wired Cable Company, because they say that company can help us with our thesis, most likely in the equipments. However, after a long way of driving we got nothing, because the Engineer or owner of that Company was not there that time.
SAN JOSE CITY
No comments:
Post a Comment